So we had the walk through this morning. Everything looked good. Went round and looked at everything in detail and put purple sticky tape where the paintwork needed touching up, and made notes of a couple of downlights not working - presumably just need new bulbs.
The driveway is still not finished because of the rain we've had this week, but that's scheduled for early next week wether permitting. So we'll obviously have to check that before making final payment. Also found out the appliances go in after handover which is fine with us - less chance of them being nicked if the place is occupied.
I tried to take a few photos, but the batteries in my SLR packed in after two shots. :(
Looking forward to getting the keys and moving in.
Our experience of building a Wisdom Homes Impression 33 MKII in Peakhurst, Sydney
Friday, April 3, 2009
Wednesday, March 25, 2009
Walk Through Next Friday!
Just found out that our walk through will happen next Friday! The build will have only taken about 4 months allowing for the xmas shutdown. Amazing. :)
Sunday, March 22, 2009
Another shot of the front
Here's another shot of the front of the house with the garage and doors closed. We're not sure if the front door should be a light colour, to match the garage, or whether it's ok like it is. Watch this space. The photos are off a camera phone so are poor quality.

They've also completed all the floor tiling downstairs...
They've also completed all the floor tiling downstairs...
Friday, March 20, 2009
Front Painted
Thursday, March 19, 2009
Painting, Plumbing, Splashback
So the painting has been started on the inside, the plumbers have put baths, toilets & taps in. The kitchen splash back is also on. It seems that something has been happening on site almost everyday. Full credit to our site supervisor for organising everyone so well.
So straight on to the photos...
Home Theatre in Taubman Manhattan...

Footer lights in home theatre...

Kitchen with splashback...

Kitchen sink tap is in...
So straight on to the photos...
Home Theatre in Taubman Manhattan...
Footer lights in home theatre...
Kitchen with splashback...
Kitchen sink tap is in...
Saturday, March 7, 2009
Small update
So a few more bits and pieces have been done this week, so here's a few photos.
The Ice Snow caeserstone benchtops have gone in and look very nice from what we can see under the sheeting.

And here's the waterfall end that we paid extra for.

And in case you haven't seen enough yet, another kitchen shot.

Tiling in the laundry.

Our SS arranged for this angled piece of gyprock under the stairs to be extended so it's flush with the ends. See photo below of what it looked like before. This was done at no expense to us and we didn't even ask for it to be done. A small change, but I definitely think the end result looks better.
The Ice Snow caeserstone benchtops have gone in and look very nice from what we can see under the sheeting.
And here's the waterfall end that we paid extra for.
And in case you haven't seen enough yet, another kitchen shot.
Tiling in the laundry.
Our SS arranged for this angled piece of gyprock under the stairs to be extended so it's flush with the ends. See photo below of what it looked like before. This was done at no expense to us and we didn't even ask for it to be done. A small change, but I definitely think the end result looks better.
Sunday, March 1, 2009
More Tiling