Thursday, November 6, 2008

Waffle Pods In (Top level)

By lunchtime yesterday (when I last went to the plot) they had installed the waffle pods to the top level of the base:



The bottom level is yet to be done. However I also noticed when they first did the piers that they had left about 5 piers at the front of the house yet to be filled with concrete. I assumed they ran out of concrete and would be back to fill them, but they're still empty. Now the black sheeting is down I'm worried they're going to forget to fill them, so I'll make a call to our SS today just to make sure they've got it covered. You can see some of the holes for the piers that haven't been filled in the next two pitures.